Micargi Puma with twin 97cc flat top lifan's

Now that you mentioned it, I think I saw that. When I first joined, I was looking through many of the postings and noticed, what I thought, looked like the base of an engine stand, but, didn't pay much attention. I'll take another look. Gracias!
 
Bit of welding was done today by an elf while I was sleeping. Less of a joke then you think. Here is what I found upon awakening.
 

Attachments

  • JS Blockaa.jpg
    JS Blockaa.jpg
    114.8 KB · Views: 247
  • JS Blockaab.jpg
    JS Blockaab.jpg
    78.2 KB · Views: 225
Ok this next jump in developments took 3hrs of jawing with myself and wizzkid. His welding is far superior to mine and he is teaching me a lot. We met him because he chased down TJ Burner who was on his motor assisted bicycle with his service tuck. To met another with a motor assisted bicycle. The TJ introduced us to him. Any way his skills sure have helped this build come along here toward the end.

Todays progress will be mounting the engine plate. It will be welded into the frame and the holes for the engines not set. Note: First engine plate was eliminated, this is a new one.
 

Attachments

  • Down the line.jpg
    Down the line.jpg
    80.4 KB · Views: 238
  • Top Down.jpg
    Top Down.jpg
    115 KB · Views: 260
  • Front Drive side.jpg
    Front Drive side.jpg
    105 KB · Views: 288
  • Rear Drive Side.jpg
    Rear Drive Side.jpg
    134.5 KB · Views: 306
I'm really liking the build process. It will be a hoot, when it hit's the streets.
Where did you get your plug wires? They are styl'n!
 
WOW!
Talk about clean and compact,that's looking awesome.No exsses pagage there.
That is realy looking sharp...................Curt
 
I'm really liking the build process. It will be a hoot, when it hit's the streets.
Where did you get your plug wires? They are styl'n!

I have used these red wires on other builds and even orange on Project Orange Peel. You can buy lengths on eBay for cheap. Cloth wrapped wire.
Give credit where credit is due. Cloth wire idea was from here a while back when I started do it I saw it here first. http://motorbicycling.com/showthread.php?t=43336&highlight=cloth+wire
 
Alternator Plate and positioning final.
 

Attachments

  • alternator platea.jpg
    alternator platea.jpg
    87.3 KB · Views: 262
  • alternator platec.jpg
    alternator platec.jpg
    92.3 KB · Views: 248
  • alternator plated.jpg
    alternator plated.jpg
    129.7 KB · Views: 294
  • alternator plateb.jpg
    alternator plateb.jpg
    92.6 KB · Views: 271
the good thing about your clutch being on the jackshaft is your gonna keep spinning the kubota for constant power to charge battery and run your lights my set-up is not charging in the idle position because the clutch is on the engine i have to get the bike up to about 15 before the kubota will throw a charge the bigger the pully on the j-shaft the faster you will spin the generator sweet job labrat let me know how it goes when you test ride it
glennbo
 
Wizzkid stopped by this evening and we got some work done on the exhaust. Still not done. There will be a stinger tip inside of the cone on the inside of the stainless steel tip. The end pipe will then act as a megaphone.
 

Attachments

  • Puma Twin Exhaust aas.jpg
    Puma Twin Exhaust aas.jpg
    95.8 KB · Views: 272
  • Puma Twin Exhaust aa.jpg
    Puma Twin Exhaust aa.jpg
    99.5 KB · Views: 307
  • Puma Twin Exhaust aasa.jpg
    Puma Twin Exhaust aasa.jpg
    95.2 KB · Views: 270
WOW! that is looking awesome. Handel bar tube? I say one twin done right.........Curt

Yes the handle bar tubes. Gnarly curves in the old 10 speed bars. We have a few used cycle shops between Tacoma and Seattle and I pic them up usually 5 bucks or less a pair.
 
You finiish yet? Lolz nice dude...i just spent 2 hours catching up...nice dude

02-23-2013, 07:51 PM <=== time stamp on build.... I had no idea it been this long. I am sorry for this, had I known I would not have started the thread so soon. I didn't know a) what I was getting into when I started b) have had a time with (money) purchasing parts and c) time there is not enough time.

Also 6 other MABs were built while this one was in waiting or being worked on or perhaps not being worked on.

Let myself down with this build taking so long.
 
Back
Top