I'm lucky it was only a wee clamp.
I finished up the top four holes and did a test fit. still pretty rough, My plan is to get everything in place on the bike, clamp it down and drill the bottom holes in place. But I need a center punch for this bit. I am thinking if i eyeball the alignment as best I can then drill the four holes through the brackets and the bike at once I can get the bolt through by drilling a slightly wider hole than necessary to make up for any misalignment.
Once I have it secure I am going to take it apart again and round the corners of the brackets.
I want this tank on there securely, I might not be using it forever and I already have my eye on another seat, but there is exactly enough space on the top tube for this tank.
I finished up the top four holes and did a test fit. still pretty rough, My plan is to get everything in place on the bike, clamp it down and drill the bottom holes in place. But I need a center punch for this bit. I am thinking if i eyeball the alignment as best I can then drill the four holes through the brackets and the bike at once I can get the bolt through by drilling a slightly wider hole than necessary to make up for any misalignment.
Once I have it secure I am going to take it apart again and round the corners of the brackets.
I want this tank on there securely, I might not be using it forever and I already have my eye on another seat, but there is exactly enough space on the top tube for this tank.
Attachments
-
121.8 KB Views: 135
-
113 KB Views: 129
-
98.4 KB Views: 126
-
278.7 KB Views: 166