well... build's on hold for now, winter finally happened.
In the meantime I have decided to severely over-think my first time getting something welded. As of now I hope to get four tabs welded to the top tube for mounting the gas-tank.
Figured I might as well throw some questions I have on here:
If I take this bike to a welder and ask him to weld tabs to the top tube, what prep work would he want me to have already done?
In that vein, what data should I know about the bike that he might ask me? (e.g. steel? tube thickness?)
Can anyone suggest a good sealant I can spray onto the bike afterward?
Any tips you think I should hear really?
In the meantime I have decided to severely over-think my first time getting something welded. As of now I hope to get four tabs welded to the top tube for mounting the gas-tank.
Figured I might as well throw some questions I have on here:
If I take this bike to a welder and ask him to weld tabs to the top tube, what prep work would he want me to have already done?
In that vein, what data should I know about the bike that he might ask me? (e.g. steel? tube thickness?)
Can anyone suggest a good sealant I can spray onto the bike afterward?
Any tips you think I should hear really?