Thanks a lot,charliechaindrive, for ypur positive comment!
Fast....well, it was quite an easy project when the idea was sketched out..
I got a well filled garage with tools,welder,grinders,blaster,powdercoater,paintsystem, edge roller,etc. And when did a little planning . f.ex. cleaning & grinding, some parts was put in de-rusting bath. Powdercoating fixes it self in the oven when sandblasting the rest. Parts was painted main color between other doing, then montage, and some relaxed time with the scallop scheme & pinstriping (approx. 6 h) with some music entertainment... sewed a new seat (2-tone) was one of the parts that took some time, because aint no specialist on the sewing, and some had to be done by hand with needle and use of a gripper........
And between the normal stuff, working (lucky enough not full time this last time)
etc....
He,he....it then looked to be quite easy..but when trying to remember, i´d say approx. 60-80 h has been used to get it nearly ready, awaiting the tires, and doing the electrical and the motorizing......
But now i got to cool down a little while, because a guy needs some help with mechanical stuff on a Cadillac............
