The Xmas rush has my limited free time is even more limited.
So this weeks progress was not too much.
During the week I made up a spacer and picked up some thrust needle bearings to go on the primary and secondary belt tension levers.
I can now tighten them down and still have them function smoothly.
No pictures of that stuff though.
Working on the induction system, the original air inlet tube only controlled the fuel/air mixture.
The engine was originally made for constant speed operation and had a fixed fuel jet and a governor in the crankshaft.
The new conversion is controlled by carburetor which is now fit into place. An air inlet is still to come.
Started making up a small muffler by cutting a shell, two side caps and an internal baffle plate.
Welded them together with a wire rod welded on the edge to give it a rolled edge look.