trackfodder
Member
I finally found the top stuff I mislaid and stuck it all together. Another surprise is the leg length makes the little 19" tire raise the bike so I had to put a 2x4 under the kickstand to keep it from tumping over. Good thing I had adjusted the length earlier by curling up the end rather than sawing it off. All that I need to do is connect the brake cable and mount the bars. It is held on with a 4 bolt bracket in the half-round saddle. If I can find a suitable chunk of ally I will mill the missing top part. Otherwise the threaded holes get raped and a pair of U-bolts used. It's a shame I couldn't drop the gooseneck in the stem but it is thicker than a bike one. I had to knurl the top and bottom of the stem so the clamps would tighten up sufficienly on the yokes. Also used a 1-3/8" thin-wall 1" ID tube to make the length difference on top of the top clamp. Stay tuned. I think it will work out good in the end.


Still trying to make front brake stop the bike.,also the twistgrip shifter on the tranny isn't letting me into 3rd gear for some reason It's a Suntour Nexis with built-in brake lever(removed)
