The Worksmans are in.. These are the tanks they will get made by Sportscarpat. Jim is making motor mounts and special sprocket adapters for the 11 GA spokes. The redesign on the adapters will allow for more lateral adjustment. These bikes can be equipped with the Pirate standard motor, the Stage 1 motor, or the Stage 2 motor kit. They will be offered as do it yourself kits or fully assembled and ready to Sail. The bikes are coming along in a well timed manner. Ready for spring for sure!
I'm gonna say that a jackshaft on a worksman may leave you faced with quite a challenge. Others say anything can be done. Ive never attempted it so I can't say for sure.
Thanks
Justin
I'm gonna say that a jackshaft on a worksman may leave you faced with quite a challenge. Others say anything can be done. Ive never attempted it so I can't say for sure.
Thanks
Justin
Last edited: