Thanks Tom for getting rid of the double post.
As I said earlier, I have never messed with the crank on any engine before and not sure how to disassemble it, but I do want to replace both main and the rod bearings, just need to know if I need some kind of gear puller or what. Any videos or links to videos would help. I don't want to replace the just seals, put it back together again and have it lock up again. Do it right while I have it apart now.
On another note, fired up the new Flying Horse engine I got from bikeberry.com and for break-in they recommended 2 tanks @ 16:1 synthetic(using Maxima ScooterPro2T). After that they said use a 20:1 ratio for normal driving, isn't that a little rich? With the old engine I was using "Opti-2" 1.8oz individual packets per 1gal.(ratio 70:1), but I've heard a lot of people talk about using 30-35:1 ratio, Any advice?
Troy
As I said earlier, I have never messed with the crank on any engine before and not sure how to disassemble it, but I do want to replace both main and the rod bearings, just need to know if I need some kind of gear puller or what. Any videos or links to videos would help. I don't want to replace the just seals, put it back together again and have it lock up again. Do it right while I have it apart now.
On another note, fired up the new Flying Horse engine I got from bikeberry.com and for break-in they recommended 2 tanks @ 16:1 synthetic(using Maxima ScooterPro2T). After that they said use a 20:1 ratio for normal driving, isn't that a little rich? With the old engine I was using "Opti-2" 1.8oz individual packets per 1gal.(ratio 70:1), but I've heard a lot of people talk about using 30-35:1 ratio, Any advice?
Troy