View Single Post
Old 04-11-2009, 09:44 PM
jezusjonz's Avatar
jezusjonz jezusjonz is offline
Motorized Bicycle Elite Member
Join Date: Feb 2008
Location: Indiana
Posts: 192
Default Re: Chop Cut Rebuild ......the movie.. lol

Sounds like were 2 of a kind. I have been that way most of my life and kinda still am but IM trying to break that get it done as soon as you can mode. One way I am breaking it is that I just make a large project a bunch of small ones that i can get done fast and then after you get them all done you've put the right amount of time in.
That dang tank though has to sit down on the top tube about 3 inches.(see pic) so I need to roll the tank skin and ends. The ends would only be a cover and not part of the tank. I found some old Gravley tanks on ebay that are 7 by 12 and all I would have to do is tunnel it and form the ends but I'll just wait something will come along or the wife will get tired of me talking about that combo shear slip roller and buy it for me.
I did have one more option was to form it out of fiberglass and then make the oil tank the gas tank one for show and one for go.....
Attached Images
File Type: jpg Tank_600.jpg (150.0 KB, 248 views)
Reply With Quote