Thread: "how we do it""
View Single Post
Old 09-06-2013, 09:30 PM
buba buba is offline
Motorized Bicycle Elite Member
Join Date: Jul 2010
Location: los angeles
Posts: 885
Default Re: "how we do it""

the red was marine paint and will take about three days to dry/cure the blueish was enamel and dried instantly in hot los angeles weather

he did not have lights-- the los angeles building inspector had him remove those he had even though he now uses water based material they could give a sh-- for the working man trying to make a living!!! so some runs and difficulty but nothing irreparable

i have not prettied up the frames but left things there for lights, reflectors tool holders do dads nothing an angle grinder and circular saw with abrasive blade can not take care of...


Last edited by buba; 09-06-2013 at 09:37 PM.
Reply With Quote