View Single Post
Old 01-22-2012, 04:02 PM
cat341 cat341 is offline
Motorized Bicycle Member
Join Date: Nov 2011
Location: New York
Posts: 31
Default Re: First build (Worksman)

Originally Posted by chainmaker View Post
Hows Your build going?
Throttle installed.
Clutch installed.
Front drum brake lever installed on throttle side (wanted to install on clutch side but the two levers on the one side didn't seem to go...i'll try it this way and move later if it doesn't feel right).
Gas tank, fuel petcock (with teflon tape), fuel filter installed. Going to have to use some double sided tape to install under the gas tank.. it moves aound and don't want to over tighten the nuts .....don't need any leaks.
Coil and spark plug installed (don't have a torque wrench I'll just be careful and try not to over tighten).
Still awaiting on the Worksman CB wheel (good thing i'm not in a rush because they sure take their time in building wheels week 3 and counting but they assured me it went out friday).
Also working on restoring a long spring saddle (too cold to paint it all parts wire brushed and ready to be primed/painted. I did soak/stretch a nice piece of leather over the seat pan we'll see how it comes out after it dries).

will add a few new photos shortly.
Reply With Quote