Thread: Op Roller Build
View Single Post
Old 03-09-2011, 02:34 AM
biknut's Avatar
biknut biknut is offline
Motorized Bicycle Elite Member
Join Date: Sep 2010
Location: Dallas
Posts: 6,280
Default Re: Op Roller Build

On our shake down run we got about 5 miles and one of the exhaust studs striped out. That was last night. Today we installed a helicoil and did a 20 mile ride with no more incidents.

I like that bike alot. I think I'm going to build several more just like it.
Reply With Quote